Back to Portfolio
Paving

Herringbone Limestone Patio

Stratford Patio Replacement. Developer-built composite decking swapped for 15m² of Dijon limestone pavers laid in herringbone, with a pave-in inspection cover.

LocationStratford, East London
CompletionOctober 2026
PhotographyVerified Project

Every house on this Stratford development came with the same composite deck at the back, put down by the developer when the houses were built. Our clients wanted theirs gone and a proper paved patio in its place.

The Brief

We removed the decking and laid Dijon honed and tumbled limestone pavers in its place. Each paver is 200 × 50 × 40mm, set in a herringbone pattern across about 15m². The honed and tumbled finish gives softly worn edges and a warm, pale colour against the brick of the house.

The Build-Up

  • 100mm MOT sub-base
  • 30–40mm bedding layer
  • Dijon limestone pavers, 200 × 50 × 40mm, in herringbone
  • Tuffjoint paving grout in the joints
  • Sealer, applied once the grout had cured

Why We Grouted the Joints

Pavers like these are usually butted tight and the joints filled with kiln-dried sand. Here we agreed with the clients to leave a gap and fill it with Tuffjoint paving grout, which keeps weeds out of the joints.

It made the laying slower. Natural limestone pavers aren't all exactly the same size, and a herringbone pattern with an even joint can't be rushed: each paver is placed and checked against its neighbours. It's slow, careful work, and it's what keeps the pattern true across the whole patio. If you're weighing up jointing options for your own patio, our paving materials guide covers what we use and why.

The Inspection Cover

The existing cover was round and black plastic, which would have broken the pattern in the middle of the patio. We replaced it with a pave-in inspection cover, a recessed tray that takes the same pavers as the rest of the surface, and set the herringbone out so the pattern runs straight through it. Access underneath is unchanged. The cover just stops interrupting the paving.

Getting It Done

The hardest part of the job was logistics. With the house in the way, every paver, bag of material and tool had to be carried through it. The paving itself took just over a week. We came back once the grout had cured to seal the patio.

The Result

The developer's composite deck is now 15m² of herringbone limestone with the inspection cover blended into the pattern. The clients were very pleased with it.

Thinking about paving your own garden? See our paving service or what paving costs.

The job in 70 seconds: laying, the finished patio and sealing.
Finished herringbone limestone patio in Stratford with a timber slat screen and a pave-in inspection coverHerringbone Dijon limestone pavers meeting a brick wall and green fence in a Stratford gardenHerringbone limestone pavers laid across the patio towards the garden shedPave-in inspection cover with the herringbone pattern running straight through it, after sealingLow-angle view of sealed honed and tumbled limestone pavers with grouted jointsHerringbone pavers being laid outwards from the patio doors on the bedding layerPave-in inspection cover tray ready to be filled with pavers to match the herringbone pattern